All consignments are despatched and delivered using approved and preferred carriers or hauliers to ensure safe and efficient transportation.
 

Packages sent via courier are securely packed to withstand transit conditions. Larger consignments are palletised and wrapped to ensure stability and protection during handling and transport. All consignments are routinely checked prior to despatch and again during loading to confirm correct labelling, quantity, and condition.
 

Upon delivery to the customer’s premises or building site, consignments must be inspected before unloading in accordance with the recipient’s internal unloading procedures. Ensure that the pallet is secure and stable before removing it from the vehicle.
 

If there are any signs of damage, Tec Ties Limited must be notified immediately.

Any shortages or damages must be reported within 48 hours of delivery.

HANDLING

All materials, components, and finished products must be handled safely and with care to prevent injury and damage to the product.

Personnel involved in handling must follow safe working practices at all times and use appropriate Personal Protective Equipment (PPE) such as safety gloves, safety boots, and high-visibility clothing. Products may contain sharp edges or pointed ends. Extra caution must be taken when lifting, moving, or unpacking these items to avoid cuts or other injuries.

Where mechanical handling equipment (e.g. forklifts, pallet trucks) are used, operators must be trained and authorised, and equipment must be in good working condition. Loads should be evenly balanced and secured before lifting or moving. All items should be placed and stored safely to prevent slips, trips, or falls. Any shortages or damages must be reported within 48 hours of delivery.

Safe manual handling techniques should always be used — bend knees, keep the back straight, and avoid twisting or overreaching. Assistance or lifting aids must be used for heavy or awkward loads. We recommended that individuals don’t carry more than 25kg. for further guidance see HSE regulations and manual handling legislation.

KEY HAZARDS

INSTALLATION

TecTies Limited products must be installed in accordance with the relevant product specifications, Declaration of Performance (DOP), and current building regulations to ensure full compliance with performance and safety requirements.

Only competent and trained personnel should carry out installation work. Working in accordance with the current HSE manual handling legislation.

Products must be checked prior to installation to confirm that they are undamaged, of the correct type, and suitable for the intended application. Any damaged or non-conforming items must not be installed and should be reported immediately to the supplier or site supervisor.

 

Installation must be carried out using appropriate tools, equipment, and Personal Protective Equipment (PPE). Care should be taken when handling or fitting components with sharp edges or when working at height or in restricted areas.
All products must be installed in line with current building regulations, project specifications, and site safety procedures.

Once installation is complete, the work area should be checked to ensure all fixings are correctly secured, and waste materials are recycled or disposed of safely and responsibly.

ISO Logos 2025.png
ukca-black-fill.png

Be assured of our commitment to Quality and Maintaining Standards. All TecTies products are guaranteed to be manufactured from 304 Grade 18/8 Austenitic Stainless Steel and are fully CE Compliant.

Get in touch

location Icon.png
phone Icon.png

Tecties, Hague Bar Works, Hague Bar, New Mills SK22 3AT 

T: 01663 749361    F: 01663 747897

email Icon.png
  • LinkedIn

Linkedin

Send us a message

Thanks for submitting!

bottom of page